Large Reinforcing Bars Spliced in UHPC
Presented By: Christina Freeman, FDOT Description: Construction time savings can be realized through replacement of cast-in-place substructure columns and/or piers with prefabricated bridge elements and systems (PBES). Typical cast-in-place substructure construction requires forming, placing steel, and pouring concrete at the construction site. Further work cannot progress until the concrete reaches a specified strength. Use of precast elements can decrease the extent of work required at the site and potentially reduce required concrete curing time. Ultra-high-performance concrete (UHPC) can be used as a joining material for PBES to enhance the connection details by minimizing reinforcement conflict and reducing the shoring or support requirements for PBES. UHPC has high early strength, requires less development or splice length than conventional concrete and has been used previously for accelerated construction projects. UHPC also has a discontinuous pore structure that reduces liquid ingress, significantly enhancing durability compared to conventional concrete. Although UHPC has been researched extensively, previous research for reinforcing bar splice and development lengths have focused on #9 and smaller diameter bars. Typically, larger diameter bars are used for substructures. Some research has been conducted for splice length of #11 bars, but the number of tests is limited. FDOT has completed research to determine the required splice and development lengths for large diameter bars with 1.75 to 3.75 in. clear cover. Bar sizes considered were #8, #9, #10 and #11 bars. The tested bar sizes are typical for substructure construction and include the maximum size permitted by the Florida Department of Transportation Structures Detailing Manual for footings, pier columns, piers and bent caps. Instrumentation used during testing included fiber optic strain gages adhered to the embedded reinforcing bar. The fiber optic strain gages recorded strain at 0.25 in. increments along the length of the reinforcing bar.

Structural Design Guidance for UHPC

Jesse Curtis – Caribbean Project Case Studies | NEx Workshop

Scott Ritter: Russland gewinnt den Krieg – und das eindeutig

The Most Ridiculous Mistakes Workers Make Caught on Camera

Incredible Process of 24k Pure Gold Extraction From Old PC RAM | How to Make Gold Into RAM

Comparing Steel and Fiberglass Rebar - SURPRISING results

Only Pakistani Mechanics Can Repair This Giant Caterpillar Loader Tire

The World's Most Important Machine

10 Stories in 28 Hours — Why Aren't We Building Like This Everywhere?

FREE water forever. LEGALLY!!!!

#7 Ultra High Performance Concrete (UHPC) | Part 1 | Science & Technology of Concrete

Dangerous Pakistani Factory Works FORGING the World’s Largest Industrial Gear | Full Process

Process of Constructing a Concrete Modular House in Just 2 Weeks. PC(Precast Concrete) Factory.

Why Bridges Don't Sink

Never Buy a Water Pump Again! A 65-Year-Old Plumber Made His Own Water Pump Using PVC Pipes | Update

Production Testing of BMD

250 Unbelievable Heavy Machinery That Are At Another Level

I Was Wrong About Fixed and Pinned Connections

Building a Multi-Million Dollar Home From Scratch (Satisfying ASMR)

