Putzmeister concrete pumps pour 1400+ cubic meter core pad through placing boom and Spyder boom.

Putzmeister 56Z, 47Z, CP2100 high-pressure pump, 39/35Z detachable placing boom, and CPS B18 Spyder boom are used pour this core footing for a high rise tower.

Pumping 2000+ cubic yards of concrete for a 50 story high-rise:
▶︎

Pumping 2000+ cubic yards of concrete for a 50 story high-rise:

Putzmeister 38-5 pumps into the 39Z placing boom:
▶︎

Putzmeister 38-5 pumps into the 39Z placing boom:

How Low Can You Go? Pumping With The Sany 32ZZ!
▶︎

How Low Can You Go? Pumping With The Sany 32ZZ!

Putzmeister: Ergonic Boom Control (EBC) with OneTouch
▶︎

Putzmeister: Ergonic Boom Control (EBC) with OneTouch

Pumping 700 cubic yards for an ice arena with the big dawg!!!
▶︎

Pumping 700 cubic yards for an ice arena with the big dawg!!!

Pumping 500 cubic meters of concrete with a BRAND NEW Putzmeister 56Z boom pump!!!
▶︎

Pumping 500 cubic meters of concrete with a BRAND NEW Putzmeister 56Z boom pump!!!

Insulated Concrete Form Monopour Installation
▶︎

Insulated Concrete Form Monopour Installation

FOR SALE: 2008 Putzmeister 58-5Z concrete pump on a 2008 Mack MRU chassis
▶︎

FOR SALE: 2008 Putzmeister 58-5Z concrete pump on a 2008 Mack MRU chassis

Pumping 4000 cubic yards of concrete with just 3 Alliance concrete pumps!!!
▶︎

Pumping 4000 cubic yards of concrete with just 3 Alliance concrete pumps!!!

Two BIG Pumps, One BIG Concrete Pour!!! (1250 cubic yards with a Somer laser screed)
▶︎

Two BIG Pumps, One BIG Concrete Pour!!! (1250 cubic yards with a Somer laser screed)

Two Concrete Trucks Fill a Trench for a Botched Water Main Valve Repair
▶︎

Two Concrete Trucks Fill a Trench for a Botched Water Main Valve Repair

How Concrete is Made!
▶︎

How Concrete is Made!

Concrete Pumping with the Sany Boom-Pump: Full Job (start to finish)
▶︎

Concrete Pumping with the Sany Boom-Pump: Full Job (start to finish)

Nearly had a disaster on this one!!! Concrete pumping with 2 pumps with Muddyfeet
▶︎

Nearly had a disaster on this one!!! Concrete pumping with 2 pumps with Muddyfeet

Experiencing technical difficulties while having 4 hours old concrete in the pump (part 1):
▶︎

Experiencing technical difficulties while having 4 hours old concrete in the pump (part 1):

Pouring in tight confines with the Putzmeister 38-5 concrete pump.
▶︎

Pouring in tight confines with the Putzmeister 38-5 concrete pump.

We Build Foundations for Rich Homeowners – The Shocking Truth About How They're Made, Part 1
▶︎

We Build Foundations for Rich Homeowners – The Shocking Truth About How They're Made, Part 1

The most effective way to prime a Putzmeister boom pump (I promise):
▶︎

The most effective way to prime a Putzmeister boom pump (I promise):

First big pour with the new placing-boom!!! And a quick, on-site fix for the 47Z:
▶︎

First big pour with the new placing-boom!!! And a quick, on-site fix for the 47Z:

[Stake removal work] Pulling out in a residential area in Meguro-ku, Tokyo
▶︎

[Stake removal work] Pulling out in a residential area in Meguro-ku, Tokyo