Putzmeister concrete pumps pour 1400+ cubic meter core pad through placing boom and Spyder boom.
Putzmeister 56Z, 47Z, CP2100 high-pressure pump, 39/35Z detachable placing boom, and CPS B18 Spyder boom are used pour this core footing for a high rise tower.

▶︎
Pumping 2000+ cubic yards of concrete for a 50 story high-rise:

▶︎
Putzmeister 38-5 pumps into the 39Z placing boom:

▶︎
How Low Can You Go? Pumping With The Sany 32ZZ!

▶︎
Putzmeister: Ergonic Boom Control (EBC) with OneTouch

▶︎
Pumping 700 cubic yards for an ice arena with the big dawg!!!

▶︎
Pumping 500 cubic meters of concrete with a BRAND NEW Putzmeister 56Z boom pump!!!

▶︎
Insulated Concrete Form Monopour Installation

▶︎
FOR SALE: 2008 Putzmeister 58-5Z concrete pump on a 2008 Mack MRU chassis

▶︎
Pumping 4000 cubic yards of concrete with just 3 Alliance concrete pumps!!!

▶︎
Two BIG Pumps, One BIG Concrete Pour!!! (1250 cubic yards with a Somer laser screed)

▶︎
Two Concrete Trucks Fill a Trench for a Botched Water Main Valve Repair

▶︎
How Concrete is Made!

▶︎
Concrete Pumping with the Sany Boom-Pump: Full Job (start to finish)

▶︎
Nearly had a disaster on this one!!! Concrete pumping with 2 pumps with Muddyfeet

▶︎
Experiencing technical difficulties while having 4 hours old concrete in the pump (part 1):

▶︎
Pouring in tight confines with the Putzmeister 38-5 concrete pump.

▶︎
We Build Foundations for Rich Homeowners – The Shocking Truth About How They're Made, Part 1

▶︎
The most effective way to prime a Putzmeister boom pump (I promise):

▶︎
First big pour with the new placing-boom!!! And a quick, on-site fix for the 47Z:
![[Stake removal work] Pulling out in a residential area in Meguro-ku, Tokyo](https://i.ytimg.com/vi/6njNThid3S0/hqdefault.jpg?sqp=-oaymwEjCNACELwBSFryq4qpAxUIARUAAAAAGAElAADIQj0AgKJDeAE=&rs=AOn4CLCUhjE5wuuG5EYbnUsXJgG2FWbXmA)
▶︎