Interviste - Trasporto eccezionale di un condensatore da 420 tonnellate
Interviste a Michele Marraffa (Amministratore MARRAFFA srl), Secondo Fustella (General manager FBM HUDSON), Rolandi Lico (Ufficio tecnico MARRAFFA srl).

▶︎
Cristelli Srl - Posa Passerella a Pergine Valsugana

▶︎
300-feet (90m) long, 600+ ton Oversized Load departing from Tamini with a 300-ton Transformer!

▶︎
Dangerous Pakistani Factory Works FORGING the World’s Largest Industrial Gear | Full Process

▶︎
Unbelievable Ship Moments Caught on Camera

▶︎
Electricity Meter Recycling to Recover Pure 24K Gold | Amazing Gold Recovery Process

▶︎
La Nave Più Grande del Mondo Ha Sollevato l'Impossibile

▶︎
VERNAZZA AUTOGRU – IN AZIONE LA NUOVA LIEBHERR LTM 1650-8.1 DA 700 TONNELLATE

▶︎
Heavy Haulage of Giant Tank Gone Wrong!

▶︎
Spelzini - Valmalenco

▶︎
Biggest Ship Collisions and Mistakes Caught on Camera

▶︎
Idrogru KT300 & KT160 vs pressa industriale

▶︎
Cristelli Srl - Oversize transport and positioning of tanks

▶︎
Incredible World Largest Load Crane & Idiots Crane Operation Skill. Fails Heavy Equipment Machines

▶︎
This Is How The World's Strongest Anchor Chains Are Made | by @Satisfyingtech116

▶︎
Trasporto Eccezionale Modena - 15 Luglio 2019 (Exceptional Transport) - 75 mt./500-tonne!

▶︎
1500 TONS and 150 METERS: Lifting, Moving and Positioning of a Bridge

▶︎
2 Idrogru vs Carroponte a cavalletto

▶︎
Biggest Ship Collisions and Mistakes Caught On Camera !

▶︎
How Giant Workpieces Are Cast & Machined With Heavy Equipment - CNC Machine - Forging Machine

▶︎
