DUPLICAÇÃO PR-423 ARAUCÁRIA CAMPO LARGO (JUNHO 2026)
The PR-423 highway duplication works, between Araucária and Campo Largo, continue to advance in May 2026, with emphasis on the main Special Engineering Structures of the project. In this update, we show the evolution of the grade-separated interchanges at km 10+550, 12+800, 29 and 34+000, in addition to the progress in the duplication of the bridge over the Rio Verde. The images reveal different stages of execution, from earthworks and drainage to concrete structures, foundations, pillars and superstructures already under construction. The duplication of the PR-423 is one of the most important road works in the Metropolitan Region of Curitiba and aims to expand the capacity of the highway, improve road safety and facilitate the connection between Araucária and Campo Largo. 📍 Highlighted sections: ✔ Interchange at km 10+550 – Av. das Nações / Rua Luz Armando Ohpis ✔ Interchange at km 12+800 – Rua Cesário Furman ✔ Bridge over the Rio Verde River ✔ Interchange at km 29 – Rua João Stukas ✔ Interchange at km 34+000 – Rua Teodoro Augustyn If you enjoy following the progress of major infrastructure projects in Paraná, subscribe to the channel and activate notifications. FROM ABOVE – closely following the progress of major infrastructure projects in Paraná. #PR423 #Araucaria #CampoLargo #DuplicacaoPR423 #ViaAraucaria #RodoviasDoParana #Infraestrutura #EngenhariaCivil #ObrasRodoviarias #ObrasParana #PonteRioVerde #Viaduto #Mobilidade #Transporte #Parana #LadeCima

PR-418 NORTHERN BYPASS OF CURITIBA (June/26) 4K

SERRA DAS ARARAS, ATUALIZAÇÃO DA OBRA NOVA PISTA DE SUBIDA, JUNHO 2026.

TARUMÃ VIADUCT - MAY/26

PR-423 Araucária - Campo Largo Duplication (April 26)

Unbelievable Smart Workers Compilation 2026 🚧👷 Smart Engineers vs Construction Fails #79

BODYBUILDERS Laughed at Him Again… Until Anatoly Was ATTACKED 😱💪🧹 | Gym Prank GONE Wild

BARRAGEM DO MIRINGUAVA: ENCHIMENTO EM SÃO JOSÉ DOS PINHAIS | ACOMPANHE A EVOLUÇÃO!

GIANT! Flying over the construction site of the new XBRI Tires factory in Ponta Grossa 🏗️🛸

🇦🇫 Afghanistan 2026: Life Under Taliban Control | Walking Tour, Street Food & Local Markets

BH Ring Road = R$ 3 Billion (Vale) + R$ 2 Billion (Italiana INC S.P.A.)

Idiots with Fast Trucks: Heavy Equipment Fails | Extreme Oversized Truck Transport #25

If These Train Moments Weren’t Filmed, Nobody Would Believe Them

Guaratuba Bridge: 30 days later… delivery is still ongoing.

Duplicação do Contorno Norte de Curitiba (PR-418) - Abril/2026

Unbelievable Smart Workers | Genius Construction Skills, Crazy Fails | Part 100 #construction #smart

Progress of the Transnordestina Railway Superstructure

Drama Tersulit & Gila‼️Truk Eropa Muatan 100 Ton Disiksa Total Dan Kandas di Tanjakan Sitinjau Lauik

How Toilet Bowls Are Made | Amazing Toilet Bowl Manufacturing Process in Pakistan

São Paulo Launches Gigantic Urban Waterway and Surprises the World

