New build in 2 minutes

This is all three previous time lapse videos stitched together with a massive speed increase! Our new building has been constructed next to the main building here at Blackpool Aspire Academy on what was originally Highfurlong School. Construction started in March 2022 by our main contractor, Walter Carefoot and Sons, and was opened to students and staff in November 2022. Comprising of eight classrooms, toilets, an office, server room and plant room, the new building has given some much-needed extra space for the expanding student and staff population of our school. Still shots were taken using a Windows laptop and external webcam with the Windows Camera app. Unfortunately, this was situated in a working classroom and so the camera has been moved on many occasions giving a somewhat disjointed viewing experience at this speed. Time lapse video compiled with VSCD Video Editor (Windows) and edited with iMovie on an iMac. Music is 'Rains of Meghalaya' by Hanu Dixit, available from the YouTube Audio Library.