UTC Behind the Scenes of a Record-Setting Move
In late 2015, Project Cargo Logistics specialists UTC Overseas of Houston, TX, successfully completed the delivery of a massive phase-shifting transformer from China to rural Utah. The move, over 16 months in the planning required ocean, rail and over-road heavy haul and in the process, set new records in New Mexico, Arizona and Utah for the heaviest loads ever permitted for over-road transport through those states. Join us for a behind-the-scenes look at how it was accomplished and the planning and logistics involved.

▶︎
UTC Drives Poland’s Renewable Energy Vision with Expert Oversized Transport

▶︎
Super Haulers: Heavy Transport on the Move

▶︎
Züst&Bachmeier - 530to. SIEMENS-Transformer

▶︎
China Isn't Catching Up—15 Inventions Proving They've Already Won

▶︎
Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #5 #adamrose #smartworkers

▶︎
70m 145 tonne lorry meets small Surrey roundabout.

▶︎
Schwertransport

▶︎
Ships of the Future: The Coming Revolution in the Shipping Industry | FD Engineering

▶︎
How Millions Of Aircraft Parts Are Recycled Inside Massive Factory

▶︎
Unbelievable Smart Worker & Hilarious Fails | Construction Compilation #7 #adamrose #smartworkers

▶︎
Edwards' Innovative Heavy Hauling!

▶︎
Trans American Peterbilt 567 Hauling Stator Gross 487,000 Lbs. 23 Axles 235 ft Long Kenworth Pusher

▶︎
🚨 Record-Breaking Transformer Move: 816,100 lbs Delivered to Monroe, MI

▶︎
God Says:"TAKE THIS MESSAGE SERIOUSLY, BECAUSE ONLY YOU ARE SEEING IT"/God Message Now/God Message

▶︎
774,000 lb Transformer Superload - Beyel Brothers Crane & Rigging

▶︎
Schwerlasttransport durch Geseke

▶︎
Norway is Building The World's Deepest Mega-Tunnel

▶︎
Heavy Haul leaving Port of Tucson

▶︎
How A Tower Crane Gets On Top Of A Skyscraper — And How It Gets Back Down

▶︎
