Deel 22 Heeg - Terkaple,frl.

In this video, I take you to Heeg, where, after the masts have been lowered, the Asmara is lifted out of the water for 2 spot repairs to hull. During the time the boat is in the shed, the painter does his job and I do mine. The latter involves derusting running deck, priming, filling and sanding. The fender also gets my attention and the railing is repaired. Later, when the Asmara is back in the water, I will apply the walking deck paint and the forward cabin paint. English subtitle