Piccadilly Line Train Taken for Scrapping by Road - 31/07/2025
Thursday the 31st of July saw the final cars of the first full 1973 Stock tube train leave Northfields Depot heading to Kingsbury EMR Scrapyard. The car was lifted from the track by crane then loaded onto the truck before leaving the depot. I captured the loading of the car onto the truck, it departing Northfields depot and then it passing Hanger Lane roundabout.

▶︎
New Tube trains for the Piccadilly Line – inside the factory!

▶︎
Three Valenta HSTs Screaming and Sick at Exeter - 4k

▶︎
Trains at Orpington, SEML, 06/06/26

▶︎
Ever wanted to know how we wash the trains? Stabling the train at Cockfosters. Piccadilly line

▶︎
Commuter Train Crashes into Station | Plainly Difficult

▶︎
1973 Tube stock heads for the scrapheap

▶︎
Bodycam: Drunk Southwest Pilot Pulled From Cockpit Before Takeoff

▶︎
The Story Of London's Abandoned Underground Stations

▶︎
Is It Time To Say Goodbye To The Class 56s?

▶︎
(HD) London Underground 2024 Stock New Tube for London transfers to Northfields Depot 30/03-01/04/25

▶︎
A Train Comes Off The Tracks! | Paddington Station 24/7 | Full Episode

▶︎
How to Double a Railway’s Capacity: The WCML Modernisation

▶︎
Uxbridge to Acton Town. Piccadilly Line. London Underground. 1973 stock

▶︎
Onboard the Piccadilly Line: A Driver's Perspective

▶︎
Full Speed Crash: The Grayrigg High Speed Train Disaster

▶︎
The New Piccadilly Line Trains Are Being Constructed

▶︎
The Rise of Chiltern Railways: The Complete History

▶︎
Can This Building Save The London Underground From Overheating?

▶︎
What Derailed this Train? The Hither Green Train Crash 1967

▶︎
