Pioneering Spirit's jacket lift system (animation)
Pioneering Spirit will be able to remove jackets weighing up to 20,000 t in a single lift, thereby limiting subsea work and associated risks. Jackets are lifted over the stern of the vessel. After cuts have been made in the foundation piles at seabed level, or above the pile clusters as required, the main hoist blocks suspended from the jacket lift system beams raise the jacket at the main legs. The jacket is subsequently aligned with the beams, reclined, and skidded further inboard before transit. Jacket removal can be performed upon completion of topsides removal, without first requiring the vessel to offload the topsides.

▶︎
Jacket removal by Allseas' Pioneering Spirit - Ninian Northern

▶︎
Allseas' Jacket lift system - the story (complete documentary)

▶︎
SMD's 'MD3' Subsea Plough Technology

▶︎
Pioneering Spirit removing the Shell Brent Delta topsides

▶︎
24 Most Terrifying Moments of Boats and Ships Launch Failures Caught on Camera

▶︎
Somali Pirates Made One Huge Mistake — They Boarded a Ship With Ex-U.S Marines

▶︎
$60M Catastrophe: The Giant Crane That SNAPPED And Rose Again

▶︎
Werken op het grootste werkschip ter wereld! #616

▶︎
Pioneering Spirit installs the Johan Sverdrup DP topsides

▶︎
Watch This 300,000-Ton Ship Disappear | The Final Moments of a Stellar Banner long version HD

▶︎
Fixed Platform Installation Project 🛠️👷 #engineering #construction #offshore

▶︎
Pioneering Spirit: The Largest Construction Ship in the World

▶︎
Pioneering Spirit removing the Yme topsides HD

▶︎
LARGEST CONSTRUCTION SHIP EVER BUILT "PIONEERING SPIRIT" ARRIVES AT ROTTERDAM - 4K SHIPSPOTTING 2023

▶︎
World’s Strongest Ship: The Titan That Redefines Heavy Lifting | FD Engineering

▶︎
Pioneering Spirit removing the Yme topsides

▶︎
Watch the Pioneering Spirit 5,500t beams installation

▶︎
Pioneering Spirit: Kijkje aan boord van het grootste werkschip ter wereld

▶︎
(1) The Ninian Central Platform. An inside view.

▶︎
