⁴ᴷ⁶⁰ Reconstruction and Reopening of the 63rd St Line

After several months of closures for extensive track reconstruction work, the 63rd St line has fully reopened, with regular F train service resumed. The line has received heavy track reconstruction work, a prudent and smart decision by the MTA to ensure that the line remains in a state of good repair. This video takes a closer look at the work that was done. Enjoy! Join this channel to get access to special perks! ▶️    / @djhtransport   Click here to Subscribe! http://bit.ly/SubwayVideo "Like" the Facebook page! ▶️   / djhtrains   Check us out on TikTok! ▶️  / djhammerstrains   Join the Transportation Facebook group! ▶️ http://bit.ly/TransportFB Follow us on Twitter! ▶️   / djhtrains   Taken in 2024.