MRT Putrajaya Line Phase 2 | Kwasa Damansara ⇒ Putrajaya Sentral (Full Journey - 36 Stations)

MRT Putrajaya Line Phase Two start operations on 16th March 2023, 3.00PM The MRT Putrajaya Line is the second line of the MRT Project that expending the existing MRT line to serve better public transport connectivity for the commuters. The new MRT line will passing through numerous high population residential as well as township area from Kwasa Damansara and up to Putrajaya. The alignment will have a length of 57.7km, consisting of 44.2km of elevated tracks and 13.5km running through underground tunnels. It will have 36 operational stations of which 27 are elevated and 9 underground. There will be total of 10 interchange stations and connecting stations for the commuters to transfer from the MRT Putrajaya Line to existing rail lines. Reference: https://myrapid.com.my/bus-train/rapi... This video recorded (CAB VIEW) from the train departing from Kwasa Damansara station and ending in Putrajaya Sentral station. #klstuff #putrajayalinephase2 #mrtputrajayalinephase2 #rapidkl #howtotakemrtputrajayalinephase2 #howtogettomrtputrajayaline #klrailway #mrtview #capviewonmrtputrajayaline #kualalumpurview ------------------------------------------------------------------------------------ Thanks for watching, be sure to check out for more video clips. Please SUBSCRIBE, leave a LIKE 👍 and COMMENT below 👇

MRT Putrajaya Line - Kwasa Damansara to Putrajaya Sentral Station (12 February 2024)
▶︎

MRT Putrajaya Line - Kwasa Damansara to Putrajaya Sentral Station (12 February 2024)

[4K] 🚇  Cab Ride Kuala Lumpur 🇲🇾 Metro MRT Kajang Line・Malaysia 4K
▶︎

[4K] 🚇 Cab Ride Kuala Lumpur 🇲🇾 Metro MRT Kajang Line・Malaysia 4K

KTM KOMUTER KL SENTRAL→TANJONG MALIM FULL EXPERIENCE 🇲🇾🚆 KTM Komuter 2314up KL Sentral→Tanjong Malim
▶︎

KTM KOMUTER KL SENTRAL→TANJONG MALIM FULL EXPERIENCE 🇲🇾🚆 KTM Komuter 2314up KL Sentral→Tanjong Malim

LRT Sri Petaling Line Sentul Timur SP1 AG1 ST11 - Putra Heights SP31 KJ37
▶︎

LRT Sri Petaling Line Sentul Timur SP1 AG1 ST11 - Putra Heights SP31 KJ37

Klang Trip Part 1: Return to City Centre... (30 Mar 2026)
▶︎

Klang Trip Part 1: Return to City Centre... (30 Mar 2026)

MRT Laluan Putrajaya Line Full Journey Ride 36 Stations from Kwasa Damansara Opening Day 16 March
▶︎

MRT Laluan Putrajaya Line Full Journey Ride 36 Stations from Kwasa Damansara Opening Day 16 March

Train Spotting at Putrajaya Station - KLIA Express and KLIA Transit Train Service
▶︎

Train Spotting at Putrajaya Station - KLIA Express and KLIA Transit Train Service

What REALLY Happens After Singapore's Last MRT Train
▶︎

What REALLY Happens After Singapore's Last MRT Train

Minecraft  1 18 2   Singleplayer MTR Minecraft Transit Railway (Respawn line)
▶︎

Minecraft 1 18 2 Singleplayer MTR Minecraft Transit Railway (Respawn line)

LRT KELANA JAYA LINE ARRIVING & DEPARTING COMPILATION #5
▶︎

LRT KELANA JAYA LINE ARRIVING & DEPARTING COMPILATION #5

4 Hours of Tokyo Yamanote Line Rides | Multi-Station JR Train Journey 4K
▶︎

4 Hours of Tokyo Yamanote Line Rides | Multi-Station JR Train Journey 4K

MRT KAJANG LINE (SBK LINE) + MRT PUTRAJAYA LINE (SSP LINE) ARRIVING & DEPARTING COMPILATION #2
▶︎

MRT KAJANG LINE (SBK LINE) + MRT PUTRAJAYA LINE (SSP LINE) ARRIVING & DEPARTING COMPILATION #2

Gombak Putra Heights Kelana Jaya Line LRT day after reopening front full ride Subang Jaya rain ASMR
▶︎

Gombak Putra Heights Kelana Jaya Line LRT day after reopening front full ride Subang Jaya rain ASMR

MRT Laluan Putrajaya Line Full Journey Ride 36 Stations towards Kwasa Damansara Opening Day 16 March
▶︎

MRT Laluan Putrajaya Line Full Journey Ride 36 Stations towards Kwasa Damansara Opening Day 16 March

ETS3 JB to KL (Full Review) Malaysia Newest Fast Train connects to RTS Link
▶︎

ETS3 JB to KL (Full Review) Malaysia Newest Fast Train connects to RTS Link

KL Monorail KL Sentral to Titiwangsa
▶︎

KL Monorail KL Sentral to Titiwangsa

[JAPAN TOKYO ASMR] 1 HOUR COMPLETE Yamanote Line 山手線 Train Ride - CAB VIEW 前面展望 - INNER LOOP | 4K
▶︎

[JAPAN TOKYO ASMR] 1 HOUR COMPLETE Yamanote Line 山手線 Train Ride - CAB VIEW 前面展望 - INNER LOOP | 4K

LRT KELANA JAYA LINE ARRIVING & DEPARTING COMPILATION #7
▶︎

LRT KELANA JAYA LINE ARRIVING & DEPARTING COMPILATION #7

[Rear Track View] MRT Putrajaya Line - Kwasa Damansara to Putrajaya Sentral (10 May 2024)
▶︎

[Rear Track View] MRT Putrajaya Line - Kwasa Damansara to Putrajaya Sentral (10 May 2024)

Malaysia's electric train service: From Johor Bahru to Kuala Lumpur in 3.5 hours
▶︎

Malaysia's electric train service: From Johor Bahru to Kuala Lumpur in 3.5 hours