2 Story, Vacant With Heavy Fire • Engine 2 on S. San Joaquin • Stockton, California
In this video capture from 2023, Engine 2 arrives first-due to a working structure fire on South San Joaquin. Engine 2 is aware of the vacant nature of the structure and possible squatters living inside. Engine 2 works quickly to extinguish the fire inside the structure and check for extension throughout. This is the first of two working structure fires that shift for Stockton Firefighters. Both fires were extinguished without incident or injury. We are proud to serve and protect the City of Stockton, California.

▶︎
Aggressive Interior Fire Attack & Vertical Ventilation • Poplar & Sutter, Stockton CA

▶︎
Heavy Fire In A Warehouse • Multiple Homes Threatened • Weber & D • Stockton, CA

▶︎
Aggressive Pace & Fire Attack • Engine 7 • Stockton, California

▶︎
Quick Work By 1st Alarm Assignment • E11; Multiple video captures • Kimball Hill, Stockton, CA.

▶︎
First Engine on Scene | Fourth of July House Fire | Officer & Driver POV | 7/4/2025

▶︎
Cape Henry Towers High-Rise Fire Post Incident Analysis

▶︎
Newark Ohio Fire Department House Fire Flashover. Dashcam with radio traffic. Command training.

▶︎
When the Sky Turned Black

▶︎
Quick Attack and Knock Down • Engine 9 on Pilgrim

▶︎
Hiker Accidentally Solves 7-Month Missing Person Cold Case

▶︎
Пожар в Сочи. Огонь перекинулся на жилые дома

▶︎
Vertical Ventilation of a Commercial Roof • Evacuation & Change to Defensive • Stockton, California

▶︎
Stockton Fire • One Weekend in June 2022

▶︎
2nd Alarm on Arrival - Midnight Building Fire

▶︎
Scene Size-Up and Command Done RIGHT

▶︎
Fireground Command, The First 5 to 10 Minutes, 20 Fires, Civilian Rescues, Chief Curt Isakson

▶︎
Small House, Heavy Fire, Quick Knock • Yosemite Street, Stockton, California

▶︎
Six Minutes of Size-Ups • Volume 3 • Stockton Firefighters

▶︎
FIRE AT THE BARGUM TIRE PLANT IN MARKOWA | FIRE EXTINGUISHING ACTION AND FIRE BRIGADE RESPONDING

▶︎
