The Two Biggest Challenges on Coke Drum Reliability facing the Industry
2020 RefComm Global Presentation The author draws on his thirty-year experience in coke drum reliability to identify the three most significant challenges that industry currently faces in this area. Three widespread practices related to inspection strategy constraints, inspection error, and quality assurance of weld overlay repairs can materially impact coke drum reliability. Case studies are used to demonstrate the consequences of these practices and the urgent need to address them.

▶︎
A Complete Inspection Strategy for Coke Drums

▶︎
Ruhrpumpen Hydraulic Decoking System Product Overview

▶︎
Coking Unit Repair at CITGO Lemont Refinery

▶︎
What Does the Future Hold? Disruptive Changes and Chaos - Becht Engineering

▶︎
The Tragedy Behind the American Chopper Cast — Where Are They Now?

▶︎
The World's Most Important Machine

▶︎
The French Do Not Care About Work

▶︎
Getting Started with Virtual Reactor 26 0

▶︎
Only Five People Know The Secret To Making Zildjian's Iconic Cymbals | Still Standing

▶︎
Watch Ukrainian Drones OBLITERATE a Russian Plane

▶︎
How America's Oldest Drum Factory Stayed In Business For Over 160 Years | Still Standing

▶︎
Watch this if everything feels too much (gentle comfort for tired women)

▶︎
Think Faster, Talk Smarter with Matt Abrahams

▶︎
A Coke Drum Bottom Unheading Device with Integral Feed Inlet

▶︎
The Frank Zappa Interview That Still Feels Dangerous Today (1984)

▶︎
What do tech pioneers think about the AI revolution? - The Engineers, BBC World Service

▶︎
Inside the Largest Wood Sawmill Factory – How Plywood Is Made From Logs to Table (Full Process)

▶︎
Rowan Atkinson's Brilliant Humor Leaves Celebrities in Tears!

▶︎
Large Language Models explained briefly

▶︎
