Schindler Smart MRL at Tonbridge

This awesome Schindler smart MRL isn't running too well because the stupid dumb idiots at Nova lifts have bodged it as they don't know what they are doing off. Schindler smart MRLs use intelligent leveling (as with all Schindler traction lifts since the 80s). This is where the lift predicts how long it will take it to stop when slowing down at a set rate from a certain speed so that it can slow down at exactly the right moment, reducing stopping times. But the simple lift engineers at Nova don't have the intelligence to understand how proper lift systems work, and they have badly bodged this lift so that it now uses basic 2 speed leveling. Also, as well as that the lift runs in a very jerky way which is not now a Schindler smart MRL is supposed to run. http://beno.org.uk