GVK’s Alaknanda Hydropower project
The project is a run-of-the-river 330 MW Hydro Electric Project and is located in Tehri/Pauri Garhwal District of Uttarakhand on the river Alaknanda, Shrinagar. This six minute film captures the challenges of building a hydropower plant and how GVK successfully overcame these and commissioned it.

▶︎
How to make hydro smaller (and better)

▶︎
China's $100BN Himalayan Mega Dam

▶︎
How Indian Engineers Dug Through the Himalayas at Over 3,000m and Shocked the World

▶︎
All Dams Are Temporary

▶︎
How Different Spillway Gates Work

▶︎
How Pumped Storage Power Plants Work (Hydropower)

▶︎
How to solve our Big Dam Problem

▶︎
How Francis Turbines Work (Hydropower)

▶︎
#6 Power at Last: Micro Hydro Turbine - Off-Grid SUCCESS

▶︎
500 Watt Hydro Power System in Virginia (Overview)

▶︎
Watch This 300,000-Ton Ship Disappear | The Final Moments of a Stellar Banner long version HD

▶︎
15 Biggest Mega Projects that will transform India by 2028

▶︎
Alaknanda hydro project.... during flood on 16th

▶︎
Constructing the Wonder: Hoover Dam Secrets Revealed

▶︎
The Genius of Small Hydro Turbines

▶︎
Vertical Tsunami — When a Shutdown Triggers a Massive Surge

▶︎
Hydroelectric Power | How it Works?

▶︎
Build mini hydropower on a small stream with a powerful unit

▶︎
The Wild Story of the Taum Sauk Dam Failure

▶︎
