LAYOUT UPDATE + RUNNING SESSION

LAYOUT UPDATE + RUNNING SESSION. Video V.87 This was going to be a quick video on replacing the express point but ended up doing - lots of odd jobs as well as listed. But do checkout the running session near the end that now complaints the models. Please note the running session on this video contains themed music for added drama. Here are some elements of work featured in the video, but don't panic I did not film everything for this video as I would a straight jacket editing all the clips... 😂 Re-wiring the points Replacing the some broken signals Adding the new point work Changing the track infrastructure Finishing of the OLD OAK CORNER pathway Re-weathering the Iron Bridge Re-grassing the layout everywhere Re-ballasting Re-painting the ballast and weathering Making a post for signal gantry Re-locating Relay boxes Depots - air ducting now added Moving oil depot around Re-modelling the depot car parks and re-surfacing TEA and a sandwich break Painting the electrical wire etc Many other little jobs too like making the trains work when asked ** Replacing the SHED roof and timbers over 3 days due to storm damage. BELOW - is a links to the retailers mention through the video. Rail Stuff - All railway must have's bits and bobs. https://rail-stuff.com Trainsporters - Train Storage solutions. https://trainsporters.com Hampshire Models https://www.hampshiremodels.co.uk Many Thanks for watching and supporting the channel. all the best Garry www.cheekytek.com