House Build 6 Drilling Footings for Stem Wall Rebar for our Legacy Block ICF House

We are doing the layout and drilling footings for installation of the vertical rebar going in the stem wall. This is in preparation for the stem wall contractor forming and pouring the stem wall to raise our slab height. Repairing a Damaged Gas Air Compressor -    • Repairing a Damaged Gas Air Compressor   #icf, #rebar , #houseconstruction, #concreteconstruction, #hammerdrill, #hilti, #milwaukeedrillbit, #greenbuilding, #diyhouse