What's Below in the Welland Canal.. Winter Maintenance 2023
What happens on the Welland Canal during the winter? The St. Lawrence Seaway Authority starts this winters maintenance by emptying the canal between Locks 1 and 7 to repair and maintain the physical infrastructure. The Canal is closed to shipping between January 7th and March 22nd and this enables work crews to carry on without having to schedule around any ships going through the canal. Watch our next video which will be in Port Colborne and visiting all the vessels that are on winter layover. Here are the NIAGARA SCENES link to the vessels shown in this video: HAPPY RIVER: • Heavy Lift Cargo Ship HAPPY RIVER Transits... INDUSTRIAL SKIPPER: • Heavy-Lift Cargo Ship INDUSTRIAL SKIPPER P... QIQIKTAALUK W: • Chemical/Oil Tanker QIKIQTAALUK W Passes t... J ARNOLD WITTE: • Tugboat J ARNOLD WITTE Heads for the Fligh... IVER BRIGHT: • Asphalt/Bitumen Tanker IVER BRIGHT Departs... Watch more videos of vessels on the Welland Canal at NIAGARA SCENES: / @niagarascenes

Great Lakes Sailing - Welland Canal HD time-lapse

Ship FRONTENAC Raised at Lock 3, Welland Canal (2019)

Crab Fishing Boats of Dutch Harbor, Alaska

How does that work? The Mittelland Canal | The North Report | NDR

Exploring the 2nd Welland Canal Pt1

Aerial View of SOPHIE Transit at the Welland Canal | Latvian Cargo Ship Near Port Robinson

Winter at the Soo Locks: There is No Down Time

The History of Great Lakes Freighters

Biggest Ship Collisions and Mistakes Caught on Camera

Dangers of the Welland Canal

Frachtschiffreise mit der HENNEKE RAMBOW 2025 (4K) 1. Teil

"Rolling Coal": Norfolk Southern's Massive 90-Year-Old Train-to-Ship Dock

RMR: Rick and the Welland Canal

Where Great Lakes Freighters Go To Die: Left To Rot (Part I)

2 Tage auf dem Rhein

Der Elbe-Seitenkanal: mit dem Schiff durch die Heide | Wie geht das? | NDR

Mighty Ships: MV Paul R. Tregurtha | Season 1 Episode 5 (Full Episode) | MIGHTY

Blowing up the Welland Canal

Stuck in Lock 8 - Jessica B

