COSTRUISCO una PISCINA INTERRATA (Da Zero)

12 months ago, we started the most important project of the past 10 years to expand our family farm. This includes the construction of an in-ground swimming pool and a second building with several indoor rooms. Throughout this entire time, I’ve been documenting everything that happened — all the challenges and difficulties we faced — since day one. In this video, I’ll finally explain in detail why we’re building the pool and what the entire project (which I’ve kept secret until now) is really about. It all began in December 2022, when — before starting the works — my father and I measured, with a tape line, how much of the vineyard we would have to remove to make space for the new project. Timestamps: 00:00 – Intro 00:27 – Calculating the project perimeter 00:47 – Removing the vineyard 02:07 – Seismic tests 02:34 – Leveling the ground 03:17 – Water and electricity setup 05:35 – First major excavation 06:17 – Crane installation 07:00 – Foundation of the building 07:57 – Pool excavation 09:10 – Pool foundation 11:07 – Floor and pillars of the building 12:18 – Helping the bricklayers 14:47 – Pipes and pool floor 15:17 – Building the pool’s vertical walls 20:30 – Pool walkway 22:50 – Roof construction 23:47 – Water and electricity across the site 25:11 – Electrician and plumber at work 25:57 – Tile installation 26:53 – Plastering and thermal insulation 28:15 – Indoor tiling 28:42 – What exactly are we building? #filipscountry #construction #swimmingpool