DE18 Smart Hybrid prototype pulls 1300 tons uphill in the Belgian Ardennes
On April 28, 2022, a prototype of the new DE 18 Stage V Smart Hybrid BFLux(D) locomotive by Vossloh Locomotives performed a test run on the challenging hills of the Ardennes in Belgium. The test took place on Line 166 between Namur and Athus, in the Belgian Ardennes, a region infamous for its hills and high inclinations. The test configuration consisted of the DE 18 (1800 KW, 80t, 17m long), 15 loaded wagons (80t each) and a back-up locomotive (87t). The train departed from Ronet, near Namur, and came to a halt near Bertrix (PK 32.000) uphill with an inclination of 12‰. From standstill, it then departed further uphill towards the Viaduc de Thanville with a 13,1‰ inclination. As expected, the DE18 Smart Hybrid had no trouble at all taking the 1300 tons of weight uphill. For the powerful MTU engine and the advanced single-axle tractive control system, even rainy conditions would have posed no problem. The DE18 Smart Hybrid raises the bar for 4-axle non-electric locomotives. In many cases, a single DE18 will be able to replace double-traction operation. It offers high performance with fuel savings of 15-50% depending on the use case. Its Stage V engine saves 80-95% on the exhaust of pollutants like NOx, CO, and small particulate matter. Importantly, it is ready for CO2-reducing fuels such as HVO and, therefore, can save up to 90% in CO2 emissions. Nexrail Lease has ordered up to 50 DE18 Stage V smart Hybrid BF Lux (D) Locomotives. Deliveries will start as of 2023. Will you be joining the green revolution? Contact us at [email protected]

AUX SECOURS DES TRAINS, LES GRANDES GRUES DE RELEVAGE A LA SNCF L’HISTOIRE DE CES MONSTRES D’ACIER

The Gas Turbine Locomotives GE Built Brand New and America Quickly SCRAPPED

BB 66304 french diesel locomotive cold startup

Total Idiots at Work Caught on Camera | Best of 2024

People Who Messed With The Royal Guard and Regretted It!

Die Geislinger Steige (Stuttgart-Ulm) mit TEE BR 101 "Rheingold", IC 2012 BR 218 nach Oberstdorf etc

How Train Tracks Are Manufactured – This is How Train Tracks Are Made - Tudo Tech HD Channel

65 million euros lost: Why Deutsche Bahn is shutting down its almost new double-decker trains

Amazing freight train action in Cologne 🇩🇪! First Visit to Köln-Gremberg & Köln-West 🚆🔥

How Millions of Feet of Railroad Tracks Are Installed Inside Massive Construction Line

Cabride 📢 Commented 📢 – BB 36300 Tribute | MA100 Banking Service in the Maurienne

10 of the Most Absurd Locomotives of All Time — Pure Insanity

Brussels to Berlin by European Sleeper

Extreme Train Railway Tracks Replacement Modern Technology - Amazing Rail Building Machines 2021

DB Loks der 70er (V200, E16, BR01,T18.....)

Abstract Black and White wave pattern| Height Map Footage| 3 hours Topographic 4k Background

Why did the W50 disappear after the fall of the Berlin Wall? The uncomfortable answer.

Railway Track Laying Machine renewing a high-speed railway line

Compilation of Freight Trains at Muizen Station (4K) 13-02-25 | 9 Trains in 13 Minutes

