Unique Railroad Crossing Signals and Setup in Dover, NH

Thank you for watching and I hope you enjoy the video. If you are new here, my channel mostly consists of railroad videography from around the Northeastern USA. Please note that all content that I post is mine and should not be used without my consent. If you are interested in more content from me, my photography can be viewed on Instagram at:   / rail_spike_productions   About this video: On May 3, 2025, I utilized a temporary Amtrak Downeaster schedule to get some footage in Dover, NH at the railroad crossing setup at the intersection of Chestnut Street and Third Street. As a result of this temporary construction schedule (to accommodate track work), all 3 revenue sets on the Amtrak Downeaster route could be seen passing through Dover in less than an hour. First were the two Brunswick-bound trains, 697 and 1697. After these two trains, the third was Boston-bound 698. Due to it being a single track mainline through downtown Dover, 698 held just short of downtown for both northbound trains to clear the single track before making its way through town.